• Handpicked Wetherby

Roadworks in Wetherby, Boston Spa, Collingham and Thorp Arch LATEST UPDATE



Current works on the Highway...

9th October -18th October

School Lane, Walton

Two-way signals from junction at Wetherby Road t junction at Main Street, School Lane

Via BT

25th September - 20th October

Leeds Road, Collingham

Two-way signals from Wetherby Road to outside Collingham Beck

Via Northern Powergrid

16th October -27th October

York Road, Wetherby

Two-way signals near junction with School Road

Via Contracts Minor Highway Contracts

--------

Future works on the Highway...

13th November - 16th November

Sicklinghall Road, Wetherby

Road Closure from junction entrance to Linton Hills Farm to outside Sheepfold on Sicklinghall Road, Wetherby

Via BT

20th November - 20th November

High Street, Boston Spa

Two-way signals from junction of Grove Road

Via Yorkshire Water

20th November - 29th November

Privas Way, Wetherby

Two-way signals frm Crown Point Bridge

Via Bridges

11th December -12th December

Grove Road, Boston Spa

Road Close from junction of High Street

Via Yorkshire Water


  • White Facebook Icon
  • White Twitter Icon
  • White Google+ Icon